Burlingame Intermediate School (BIS)
BIS Auditorium Renovation – Phase 1
Interior Painting
Flooring Renovation
Seating Refurbishment
BIS SMARTboard Installation – Phase1
Installation of SMARTboards in multiple Classrooms
Installation in remaining Classrooms forthcoming
BIS Roofing Replacement
New roofing throughout campus and coverd walkways. Preparation for possible future Solar Panel installations
BIS Temporary Relocatable
Relocatable building placed on campus to serve as swing space during Classroom Modernization
Placement of underground utilities only this Summer. Building to be installed before Classroom Modernization.
Playfield Renovation:
Osberg Field
New Synthetic Turf and Drainage, New Perimeter Walkway, New Softball, Soccer and Lacrosse Field, Accessibility Improvements.
Architect: Dreiling Terrones Architecture